Google Docks

SECTOR: workplace

LOCATION: Barrow Street, Dublin 2

YEAR: 2011

SIZE: 3,000 sqm

A Collaboration with móla Architecture

This fast track project was the fit-out of the 8th and 9th floor of the iconic Docks (former Montevetro) building on Grand Canal Dock for 260 staff. Our scope also included a staff canteen and an eye-catching yet cost-effective temporary Reception design, before the other 11 floors of the building were to be occupied.

 

"... Mr. Heil was extremely collaborative and showed great leadership throughout the project."
Gary Howard - SISK Project manager
OfficeFitout_Google Docks Dublin-Foyer
OfficeFitout_Google Docks Dublin-Kitchenette
OfficeFitout_Google Docks Dublin-Breakout
OfficeFitout_Google Docks Dublin-Meeting Room and Breakout
OfficeFitout_Google Docks Dublin-Corridor Booths

CLIENT FEEDBACK

Andreas Heil was employed by Google Ireland as the project interior architect on the MonteVetro (now Google Docks) office fitout. During Mr. Heil’s engagement with the project we found him most professional and a key and pivotal member of the design team… Mr. Heil was extremely collaborative and showed great leadership throughout the project. He displayed great attention to detail and vision in delivering this flag-ship fit-out to the client’s aspiration and was integral to assisting SISK Ireland in doing same.

Gary Howard - SISK Project manager
OfficeFitout_Google Docks Dublin-Open Plan and Kitchenette
OfficeFitout_Google Docks Dublin-Meeting Room
OfficeFitout_Google Docks Dublin-Canteen

PHOTOGRAPHY: Shane Kelly